Assessment Year | 2017 |
---|---|
Principal Product | Nylon Tape |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
90,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $623,074 | 8,680,072 |
kWh
|
$0.072 | |
Electricity Demand | $183,183 | 14,849 |
kW-mo/yr
|
$12.34 | |
Electricity Fees | $7,654 | - |
|
- | |
Natural Gas | $567,228 | 113,419 |
MMBtu
|
$5.00 | |
Waste Disposal Costs | |||||
Water Usage | $141,447 | 76,308,785 |
Tgal
|
$0.002 | |
TOTAL YEARLY COSTS | $1,522,586 | ||||
RECOMMENDED SAVINGS* | $144,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $42,520 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $93,550 | $132,200 |
$93,780
1,302,495
kWh
|
$31,531
-
kW-mo/yr
|
$(-31,761.0)
-
MMBtu
|
|
02 | 2.2136: Install / repair insulation on steam lines | $17,208 | $14,500 | - | - |
$17,208
-
MMBtu
|
|
03 | 2.3311: Replace dc equipment with ac equipment | $17,175 | $73,000 |
$17,175
238,548
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,137 | $11,649 |
$5,472
76,003
kWh
|
$2,665
-
kW-mo/yr
|
- | |
05 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $8,708 | $9,000 |
$8,708
120,942
kWh
|
- | - | |
TOTAL RECOMMENDED | $144,778 | $240,349 |
$125,135
1,737,988
kWh
|
$34,196
-
kW-mo/yr
|
$(-14,553.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,520 | $99,149 |
$22,647
314,551
kWh
|
$2,665
-
kW-mo/yr
|
$17,208
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs