ITAC Assessment: MA0778
ITAC logo
ITAC Assessment: MA0778
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Nylon Tape
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $623,074 8,680,072
kWh
Electricity Demand $183,183 14,849
kW-mo/yr
Electricity Fees $7,654 -
Natural Gas $567,228 113,419
MMBtu
Waste Disposal Costs
Water Usage $141,447 76,308,785
Tgal
TOTAL YEARLY COSTS $1,522,586
RECOMMENDED SAVINGS* $144,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,520

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $93,550 $132,200 $93,780
1,302,495
kWh
$31,531
-
kW-mo/yr
$(-31,761.0)
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $17,208 $14,500 - - $17,208
-
MMBtu
03 2.3311: Replace dc equipment with ac equipment $17,175 $73,000 $17,175
238,548
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,137 $11,649 $5,472
76,003
kWh
$2,665
-
kW-mo/yr
-
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $8,708 $9,000 $8,708
120,942
kWh
- -
TOTAL RECOMMENDED $144,778 $240,349 $125,135
1,737,988
kWh
$34,196
-
kW-mo/yr
$(-14,553.0)
-
MMBtu
TOTAL IMPLEMENTED $42,520 $99,149 $22,647
314,551
kWh
$2,665
-
kW-mo/yr
$17,208
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs