ITAC Assessment: WV0024
ITAC logo
ITAC Assessment: WV0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automotive park brake cables and speedometer cables
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 248
Plant Area 87,080
ft2
Annual Production 5,100,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,111 2,485,932
kWh
Natural Gas $23,575 5,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,829

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $498 $451
17,292
kWh
-
02 2.4133: Use most efficient type of electric motors $327 $12,120 $327
12,603
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $400 $368 - $400
-
MMBtu
04 2.4314: Use synthetic lubricant $724 - $724
27,843
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,189 $350 $1,189
45,721
kWh
-
06 2.7444: Close holes and openings in building such as broken windows $1,252 $440 - $1,252
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $862 - $862
11,137
kWh
-
TOTAL RECOMMENDED $5,205 $13,776 $3,553
114,596
kWh
$1,652
-
MMBtu
TOTAL IMPLEMENTED $2,829 $12,968 $2,829
86,753
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs