ITAC Assessment: SF0531
ITAC logo
ITAC Assessment: SF0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Tomatoes and beans
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 688,000
ft2
Annual Production 800,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,723,525 34,936,802
kWh
Electricity Demand $991,762 65,592
kW-mo/yr
Natural Gas $4,694,097 977,298
MMBtu
TOTAL YEARLY COSTS $8,409,384
RECOMMENDED SAVINGS* $317,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $99,894 - $107,894
1,383,969
kWh
- - $(-8,000.0) -
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $88,691 $23,292 - - $88,691
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $7,968 $3,477 $3,352
43,001
kWh
- $4,616
-
MMBtu
- -
04 2.4322: Use or replace with energy efficient substitutes $1,498 $886 $1,498
19,212
kWh
- - - -
05 2.2111: Install steam trap $9,614 $6,613 - - $9,614
-
MMBtu
- -
06 2.1231: Establish burner maintenance schedule for boilers $20,839 $15,682 - - $20,839
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $54,404 $82,459 $39,545
507,242
kWh
$12,523
-
kW-mo/yr
- $2,868 $(-532.0)
08 2.2135: Repair and eliminate steam leaks $18,580 $32,000 - - $18,580
-
MMBtu
- -
09 2.2121: Increase amount of condensate returned $15,854 $35,361 $386
4,956
kWh
- $15,468
-
MMBtu
- -
TOTAL RECOMMENDED $317,342 $199,770 $152,675
1,958,380
kWh
$12,523
-
kW-mo/yr
$157,808
-
MMBtu
$(-5,132.0) $(-532.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs