ITAC Assessment: MS0179
ITAC logo
ITAC Assessment: MS0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Industrial Floor Matting
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 150,000
ft2
Annual Production 8,900
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,662 2,515,400
kWh
Electricity Demand $71,462 11,766
kW-mo/yr
Electricity Fees $3,005 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $20,073 $3,000 - $19,776
-
kW-mo/yr
$297 - - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,805 $3,789 $2,763
64,259
kWh
- $42 - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,391 $136 $1,371
31,881
kWh
- $20 - - - -
04 2.7261: Install timers and/or thermostats $454 $236 $447
10,392
kWh
- $7 - - - -
05 2.6214: Shut off pilots in standby equipment $229 $88 - - - $229
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $177 $195 $139
3,243
kWh
$35
-
kW-mo/yr
$3 - - - -
07 3.6124: Burn waste oil for heat $1,676 $2,374 - - - $626
-
MMBtu
$1,050
-
gal
- -
08 3.7196: Use re-usable filters $91 $133 - - - - - $1
-
lb
$90
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,578 $869 - - - - - - $1,578
TOTAL RECOMMENDED $28,474 $10,820 $4,720
109,775
kWh
$19,811
-
kW-mo/yr
$369 $855
-
MMBtu
$1,050
-
gal
$1
-
lb
$1,668
TOTAL IMPLEMENTED $21,693 $3,224 $1,371
31,881
kWh
$19,776
-
kW-mo/yr
$317 $229
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs