ITAC Assessment: CO0267
ITAC logo
ITAC Assessment: CO0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Food Processing Equipment
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 139,000
ft2
Annual Production 180
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,329 2,562,134
kWh
Natural Gas $14,792 3,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.8121: Apply for tax-free status for energy purchases $2,010 $250 - - $2,010 -
02 2.7314: Reduce ventilation air $1,860 $250 $1,860
61,841
kWh
- - -
03 2.7261: Install timers and/or thermostats $970 $300 $970
53,048
kWh
- - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,230 $1,800 - - - $3,230
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,210 $2,630 $4,210
78,546
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,880 $1,100 $1,880
34,877
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $450 $590 $450
8,499
kWh
- - -
08 2.7135: Install occupancy sensors $1,050 $1,600 $1,050
29,015
kWh
- - -
09 2.4314: Use synthetic lubricant $660 - $660
12,309
kWh
- - -
10 2.7243: Improve air circulation with destratification fans / other methods $1,240 $4,400 $(-55.0)
(-1,172)
kWh
$1,295
-
MMBtu
- -
TOTAL RECOMMENDED $17,560 $12,920 $11,025
276,963
kWh
$1,295
-
MMBtu
$2,010 $3,230
TOTAL IMPLEMENTED $12,310 $9,220 $9,005
194,900
kWh
$1,295
-
MMBtu
$2,010 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs