ITAC Assessment: WV0017
ITAC logo
ITAC Assessment: WV0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Mine Supply and Industrial Cars
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 57
Plant Area 111,340
ft2
Annual Production 0
units
Production Hrs. Annual 3,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,868 929,367
kWh
Natural Gas $54,581 8,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,207 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,540 $2,498 $1,540
47,773
kWh
-
02 2.4133: Use most efficient type of electric motors $567 $2,760 $567
17,585
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $5,550 $250 - $5,550
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,053 $775 - $1,053
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $454 $140 $454
14,068
kWh
-
06 2.4226: Use / purchase optimum sized compressor $274 $25 $274
8,499
kWh
-
07 2.4314: Use synthetic lubricant $652 - $652
20,223
kWh
-
08 2.1213: Direct warmest air to combustion intake $497 $960 - $497
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,620 $200 $9,620
298,359
kWh
-
TOTAL RECOMMENDED $20,207 $7,608 $13,107
406,507
kWh
$7,100
-
MMBtu
TOTAL IMPLEMENTED $12,865 $3,473 $11,812
366,355
kWh
$1,053
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs