ITAC Assessment: MUCM12
ITAC logo
ITAC Assessment: MUCM12
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Education Courses
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 60
Plant Area 179,454
ft2
Annual Production 100
units
Production Hrs. Annual 2,295
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,536 1,492,894
kWh
Electricity Demand $70,225 4,551
kW-mo/yr
Electricity Fees $15,717 -
Natural Gas $6,090 845
MMBtu
Waste Disposal Costs
Water Usage $5,606 203
Tgal
Water Disposal $8,762 770
Tgal
TOTAL YEARLY COSTS $160,936
RECOMMENDED SAVINGS* $3,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $463 $220 $295
7,964
kWh
$168
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $49 - $15
413
kWh
$33
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $166 $89 $87
2,342
kWh
$79
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $848 $2,033 $540
14,585
kWh
$308
-
kW-mo/yr
-
05 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $1,740 $880 - - $1,740
-
MMBtu
06 2.7444: Close holes and openings in building such as broken windows $403 $107 - - $403
-
MMBtu
TOTAL RECOMMENDED $3,668 $3,328 $936
25,304
kWh
$589
-
kW-mo/yr
$2,143
-
MMBtu
TOTAL IMPLEMENTED $848 $2,033 $540
14,585
kWh
$308
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs