| Assessment Year | 1993 |
|---|---|
| Principal Product | Sun Glasses |
| NAICS |
n/a
|
| SIC | 3851: Ophthalmic Goods |
| Sales Range | $10 M to 50M |
| # of Employees | 800 |
| Plant Area |
121,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $597,287 | 14,180,833 |
kWh
|
$0.042 |
| Natural Gas | $105,458 | 15,700 |
MMBtu
|
$6.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,448 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,512 | $1,967 |
$2,512
195,780
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $3,304 | $46,430 |
$3,304
64,185
kWh
|
- | |
| 03 | 2.7444: Close holes and openings in building such as broken windows | $1,335 | $250 | - |
$1,335
-
MMBtu
|
|
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,175 | $870 | - |
$6,175
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $669 | $244 |
$669
52,169
kWh
|
- | |
| 06 | 2.1213: Direct warmest air to combustion intake | $8,836 | $1,961 | - |
$8,836
-
MMBtu
|
|
| 07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,579 | $1,400 |
$1,579
123,095
kWh
|
- | |
| 08 | 2.2511: Insulate bare equipment | $272 | $42 | - |
$272
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $766 | $2,995 |
$555
24,326
kWh
|
$211
-
MMBtu
|
|
| TOTAL RECOMMENDED | $25,448 | $56,159 |
$8,619
459,555
kWh
|
$16,829
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $25,448 | $56,159 |
$8,619
459,555
kWh
|
$16,829
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs