ITAC Assessment: WV0003
ITAC logo
ITAC Assessment: WV0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Residential Lighting Fix
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 600,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,568 1,901,524
kWh
Natural Gas $83,898 17,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,893 $598 $2,893
71,805
kWh
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $720 $905 - $720
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $473 $290 - $473
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $6,675 $10,000 - $6,675
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $66 $36 $66
1,758
kWh
-
06 2.2414: Use waste heat from hot flue gases to preheat $20,126 $2,100 - $20,126
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $9,698 $2,000 - $9,698
-
MMBtu
08 2.2525: Eliminate cooling of process streams which subsequently must be heated and vice versa $4,966 $1,790 $4,966
123,095
kWh
-
TOTAL RECOMMENDED $45,617 $17,719 $7,925
196,658
kWh
$37,692
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs