| Assessment Year | 2002 |
|---|---|
| Principal Product | Paper |
| NAICS |
n/a
|
| SIC | 2621: Paper Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
130,000
ft2
|
| Annual Production | 13,000,000
lb
|
| Production Hrs. Annual | 6,936
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $245,075 | 6,634,500 |
kWh
|
$0.037 |
| Electricity Demand | $236,030 | 16,716 |
kW-mo/yr
|
$14.12 |
| Electricity Fees | $117,355 | - |
|
- |
| Natural Gas | $438,609 | 69,585 |
MMBtu
|
$6.30 |
| Fuel Oil #2 | $5,760 | 766 |
MMBtu
|
$7.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $68,564 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,251 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.211: Consider use / purchase of bulk materials where possible | $27,840 | $56,000 | - | - | - | $27,840 | |
| 02 | 2.2425: Use flue gases to heat process or service water | $26,093 | $28,000 | - | - |
$9,252
-
MMBtu
|
$16,841 | |
| 03 | 4.114: Add/modify equipment to improve drying process | $7,380 | $34,000 |
$(-940.0)
(-25,506)
kWh
|
- | - | $8,320 | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,756 | $4,000 |
$2,259
61,312
kWh
|
$1,497
-
kW-mo/yr
|
- | - | |
| 05 | 2.4131: Size electric motors for peak operating efficiency | $2,648 | $1,250 |
$1,589
43,119
kWh
|
$1,059
-
kW-mo/yr
|
- | - | |
| 06 | 2.2123: Insulate feedwater tank | $847 | $1,000 | - | - |
$847
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $68,564 | $124,250 |
$2,908
78,925
kWh
|
$2,556
-
kW-mo/yr
|
$10,099
-
MMBtu
|
$53,001 | ||
| TOTAL IMPLEMENTED | $7,251 | $6,250 |
$3,848
104,431
kWh
|
$2,556
-
kW-mo/yr
|
$847
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs