ITAC Assessment: MA0518
ITAC logo
ITAC Assessment: MA0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Paper
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 130,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 6,936
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,075 6,634,500
kWh
Electricity Demand $236,030 16,716
kW-mo/yr
Electricity Fees $117,355 -
Natural Gas $438,609 69,585
MMBtu
Fuel Oil #2 $5,760 766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 4.211: Consider use / purchase of bulk materials where possible $27,840 $56,000 - - - $27,840
02 2.2425: Use flue gases to heat process or service water $26,093 $28,000 - - $9,252
-
MMBtu
$16,841
03 4.114: Add/modify equipment to improve drying process $7,380 $34,000 $(-940.0)
(-25,506)
kWh
- - $8,320
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,756 $4,000 $2,259
61,312
kWh
$1,497
-
kW-mo/yr
- -
05 2.4131: Size electric motors for peak operating efficiency $2,648 $1,250 $1,589
43,119
kWh
$1,059
-
kW-mo/yr
- -
06 2.2123: Insulate feedwater tank $847 $1,000 - - $847
-
MMBtu
-
TOTAL RECOMMENDED $68,564 $124,250 $2,908
78,925
kWh
$2,556
-
kW-mo/yr
$10,099
-
MMBtu
$53,001
TOTAL IMPLEMENTED $7,251 $6,250 $3,848
104,431
kWh
$2,556
-
kW-mo/yr
$847
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs