ITAC Assessment: SU0320
ITAC logo
ITAC Assessment: SU0320
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Transit Buses
NAICS 336111: Automobile Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 497
Plant Area 309,500
ft2
Annual Production 463
units
Production Hrs. Annual 4,250
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,404 3,231,889
kWh
Electricity Demand $125,553 7,910
kW-mo/yr
Electricity Fees $9,890 -
Natural Gas $257,297 27,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,728 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,185 - - - $1,185
-
MMBtu
- -
02 2.7314: Reduce ventilation air $7,403 $5,019 $188
6,178
kWh
$468
-
kW-mo/yr
$6,747
-
MMBtu
- -
03 2.7243: Improve air circulation with destratification fans / other methods $18,749 $42,038 $(-1,965.0)
(-34,595)
kWh
$(-653.0)
-
kW-mo/yr
$21,367
-
MMBtu
- -
04 2.6211: Conserve energy by efficient use of vending machines $391 $1,332 $391
8,524
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,671 $37,046 $4,892
109,471
kWh
$4,749
-
kW-mo/yr
- $303 $727
06 3.1182: Make a new by-product $21,685 $100,000 $(-799.0)
(-14,290)
kWh
$(-3,635.0)
-
kW-mo/yr
- - $26,119
07 3.1161: Eliminate/reduce an operation $2,644 $15,840 $(-164.0)
(-3,438)
kWh
$(-6,075.0)
-
kW-mo/yr
- $2,098 $6,785
TOTAL RECOMMENDED $62,728 $201,275 $2,543
71,850
kWh
$(-5,146.0)
-
kW-mo/yr
$29,299
-
MMBtu
$2,401 $33,631
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs