ITAC Assessment: SD0503
ITAC logo
ITAC Assessment: SD0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Vinyl Composition Tile
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 131
Plant Area 250,000
ft2
Annual Production 3,000,000
units
Production Hrs. Annual 5,880
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,412,058 16,911,922
kWh
Electricity Demand $644,355 45,096
kW-mo/yr
Electricity Fees $(-217,193.0) -
Natural Gas $313,208 46,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,987 $2,250 $25,185
301,681
kWh
$8,802
-
kW-mo/yr
02 2.4133: Use most efficient type of electric motors $28,203 $56,758 $20,430
244,671
kWh
$7,773
-
kW-mo/yr
03 2.7124: Make a practice of turning off lights when not needed $24,981 - $13,335
159,703
kWh
$11,646
-
kW-mo/yr
04 2.7145: Install skylights $7,467 $22,980 $5,538
66,324
kWh
$1,929
-
kW-mo/yr
TOTAL RECOMMENDED $94,638 $81,988 $64,488
772,379
kWh
$30,150
-
kW-mo/yr
TOTAL IMPLEMENTED $94,638 $81,988 $64,488
772,379
kWh
$30,150
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs