ITAC Assessment: AR0102
ITAC logo
ITAC Assessment: AR0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Small Mill Equipment
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 36,000
ft2
Annual Production 250
pieces
Production Hrs. Annual 4,693
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,088 861,958
kWh
Electricity Demand $34,665 4,461
kW-mo/yr
Natural Gas $9,647 2,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,307

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,611 $390 $655
19,343
kWh
$956
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $4,248 $6,802 $2,060
60,668
kWh
$2,188
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $697 $1,330 $239
7,034
kWh
$458
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $147 $60 $72
1,758
kWh
$75
-
kW-mo/yr
- -
05 2.7211: Clean and maintain refrigerant condensers and towers $234 $30 $234
6,741
kWh
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $3,760 $6,000 - - - $3,760
-
lb
07 3.8143: Recycle cleaning solvent and reuse $12,981 $6,000 - - $12,981
-
gal
-
TOTAL RECOMMENDED $23,678 $20,612 $3,260
95,544
kWh
$3,677
-
kW-mo/yr
$12,981
-
gal
$3,760
-
lb
TOTAL IMPLEMENTED $18,307 $14,222 $2,605
76,201
kWh
$2,721
-
kW-mo/yr
$12,981
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs