ITAC Assessment: GT0437
ITAC logo
ITAC Assessment: GT0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CARPET YARN
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $511,782 9,619,871
kWh
Natural Gas $53,622 11,279
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,263 $2,991 $8,263
155,334
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,092 $2,910 $1,092
20,516
kWh
-
03 2.4133: Use most efficient type of electric motors $2,229 $2,150 $2,229
41,911
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,579 - $3,579
67,409
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,861 - $9,599
180,539
kWh
$(-5,738.0)
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,310 - $2,310
43,376
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $9,478 $1,000 $9,478
178,195
kWh
-
TOTAL RECOMMENDED $30,812 $9,051 $36,550
687,280
kWh
$(-5,738.0)
-
MMBtu
TOTAL IMPLEMENTED $30,812 $9,051 $36,550
687,280
kWh
$(-5,738.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs