ITAC Assessment: AT0092
ITAC logo
ITAC Assessment: AT0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product UNFINISHED CLOTH
NAICS
n/a
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 242
Plant Area
n/a
Annual Production 57,720
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $811,087 17,718,054
kWh
Natural Gas $83,300 27,916
MMBtu
Fuel Oil #6 $17,240 5,375
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $193,284 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $167,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.7226: Use computer programs to optimize hvac performance $110,478 $13,800 $110,478
2,412,661
kWh
- -
02 2.4133: Use most efficient type of electric motors $8,033 $2,092 $8,033
175,557
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $24,038 $8,425 $24,038
524,912
kWh
- -
04 2.7122: Disconnect ballasts $2,498 $500 $2,498
54,513
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,175 - $15,175
333,236
kWh
- -
06 2.4312: Improve lubrication practices $1,362 - $1,362
29,894
kWh
- -
07 2.2692: Use outside cold water source as a supply of cooling water $24,113 $18,600 $24,113
526,671
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $6,202 $6,000 - $5,138
-
MMBtu
$1,064
-
MMBtu
09 2.4221: Install compressor air intakes in coolest locations $1,385 $1,600 $1,385
30,188
kWh
- -
TOTAL RECOMMENDED $193,284 $51,017 $187,082
4,087,632
kWh
$5,138
-
MMBtu
$1,064
-
MMBtu
TOTAL IMPLEMENTED $167,809 $32,417 $161,607
3,531,067
kWh
$5,138
-
MMBtu
$1,064
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs