ITAC Assessment: WM0216
ITAC logo
ITAC Assessment: WM0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Zero-turn mowers and lawn tractors
NAICS 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 200,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,566 3,854,399
kWh
Electricity Demand $153,832 10,057
kW-mo/yr
Electricity Fees $84,664 -
Natural Gas $203,226 26,950
MMBtu
Waste Disposal Costs
Water Usage $60,000 5,357
Tgal
TOTAL YEARLY COSTS $738,288
RECOMMENDED SAVINGS* $10,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,835 - $4,321
70,794
kWh
$1,514
-
kW-mo/yr
-
02 2.4227: Use compressor air filters $1,040 $3,270 $770
12,624
kWh
$270
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,412 $2,346 $1,785
29,266
kWh
$627
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $447 $2,948 $340
5,574
kWh
$107
-
kW-mo/yr
-
05 2.7444: Close holes and openings in building such as broken windows $385 $580 - - $385
-
MMBtu
TOTAL RECOMMENDED $10,119 $9,144 $7,215
118,258
kWh
$2,519
-
kW-mo/yr
$385
-
MMBtu
TOTAL IMPLEMENTED $6,282 $2,948 $4,661
76,368
kWh
$1,621
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs