Assessment Year | 2024 |
---|---|
Principal Product | Zero-turn mowers and lawn tractors |
NAICS | 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
200,000
ft2
|
Annual Production | 25,000
units
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $236,566 | 3,854,399 |
kWh
|
$0.061 | |
Electricity Demand | $153,832 | 10,057 |
kW-mo/yr
|
$15.30 | |
Electricity Fees | $84,664 | - |
|
- | |
Natural Gas | $203,226 | 26,950 |
MMBtu
|
$7.54 | |
Waste Disposal Costs | |||||
Water Usage | $60,000 | 5,357 |
Tgal
|
$11.20 | |
TOTAL YEARLY COSTS | $738,288 | ||||
RECOMMENDED SAVINGS* | $10,119 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,282 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,835 | - |
$4,321
70,794
kWh
|
$1,514
-
kW-mo/yr
|
- | |
02 | 2.4227: Use compressor air filters | $1,040 | $3,270 |
$770
12,624
kWh
|
$270
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,412 | $2,346 |
$1,785
29,266
kWh
|
$627
-
kW-mo/yr
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $447 | $2,948 |
$340
5,574
kWh
|
$107
-
kW-mo/yr
|
- | |
05 | 2.7444: Close holes and openings in building such as broken windows | $385 | $580 | - | - |
$385
-
MMBtu
|
|
TOTAL RECOMMENDED | $10,119 | $9,144 |
$7,215
118,258
kWh
|
$2,519
-
kW-mo/yr
|
$385
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,282 | $2,948 |
$4,661
76,368
kWh
|
$1,621
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs