Assessment Year | 2023 |
---|---|
Principal Product | snow removal truck attachments |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $500 k to 1M |
# of Employees | 300 |
Plant Area |
177,000
ft2
|
Annual Production | 55,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $389,789 | 5,866,104 |
kWh
|
$0.066 | |
Electricity Demand | $262,479 | 16,416 |
kW-mo/yr
|
$15.99 | |
Electricity Fees | $95,714 | - |
|
- | |
Natural Gas | $279,561 | 63,100 |
MMBtu
|
$4.43 | |
Waste Disposal Costs | |||||
Water Usage | $13,284 | 3,232 |
Tgal
|
$4.11 | |
TOTAL YEARLY COSTS | $1,040,827 | ||||
RECOMMENDED SAVINGS* | $62,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $17,906 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $37,878 | $122,100 |
$28,141
426,376
kWh
|
$9,737
-
kW-mo/yr
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,702 | $8,700 | - | - |
$9,702
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,761 | $1,950 |
$4,280
64,484
kWh
|
$1,481
-
kW-mo/yr
|
- | |
04 | 2.7224: Reduce space conditioning during non-working hours | $3,796 | - |
$2,214
33,551
kWh
|
- |
$1,582
-
MMBtu
|
|
05 | 2.4227: Use compressor air filters | $3,395 | $4,786 |
$2,522
38,213
kWh
|
$873
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,014 | $4,664 |
$1,633
24,743
kWh
|
$381
-
kW-mo/yr
|
- | |
07 | 2.7444: Close holes and openings in building such as broken windows | $430 | $700 | - | - |
$430
-
MMBtu
|
|
TOTAL RECOMMENDED | $62,975 | $142,900 |
$38,790
587,367
kWh
|
$12,471
-
kW-mo/yr
|
$11,714
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,906 | $16,014 |
$5,913
89,227
kWh
|
$1,861
-
kW-mo/yr
|
$10,132
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs