ITAC Assessment: WI0135
ITAC logo
ITAC Assessment: WI0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product COLOR PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 21,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,897 815,358
kWh
Natural Gas $6,568 1,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,907

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $3,306 - $3,138
-
kWh
$168
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $3,419 $870
12,896
kWh
- $(-290.0)
03 2.7221: Lower temperature during the winter season and vice-versa $1,489 - $1,489
21,981
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $498 $1,280 $498
7,327
kWh
- -
05 2.7226: Use computer programs to optimize hvac performance $399 $1,400 $399
5,862
kWh
- -
06 2.3132: Recharge batteries on during off-peak demand periods $314 - $314
-
kWh
- -
07 2.7261: Install timers and/or thermostats $321 $400 - $321
-
MMBtu
-
TOTAL RECOMMENDED $6,907 $6,499 $6,708
48,066
kWh
$489
-
MMBtu
$(-290.0)
TOTAL IMPLEMENTED $6,907 $6,499 $6,708
48,066
kWh
$489
-
MMBtu
$(-290.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs