| Assessment Year | 2010 |
|---|---|
| Principal Product | Industrial Valves |
| NAICS | 332911: Industrial Valve Manufacturing |
| SIC | 3491: Industrial Valves |
| Sales Range | $100 M to 500M |
| # of Employees | 250 |
| Plant Area |
235,000
ft2
|
| Annual Production | 500,000
pieces
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $443,919 | 7,261,742 |
kWh
|
$0.061 |
| Natural Gas | $9,091 | 920 |
MMBtu
|
$9.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $113,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,324 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $41,350 | $68,550 |
$41,350
677,864
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $8,321 | $4,015 | - |
$8,321
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,567 | $513 |
$2,567
42,087
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,677 | $1,100 |
$1,677
27,484
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,244 | $11,715 |
$2,244
36,793
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,260 | $159,982 |
$24,260
397,704
kWh
|
- | |
| 07 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $896 | $5,000 | - |
$896
-
MMBtu
|
|
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,751 | $1,680 |
$1,385
22,709
kWh
|
$6,366
-
MMBtu
|
|
| 09 | 2.7495: Install replacement doors | $24,009 | $51,300 |
$4,418
72,424
kWh
|
$19,591
-
MMBtu
|
|
| TOTAL RECOMMENDED | $113,075 | $303,855 |
$77,901
1,277,065
kWh
|
$35,174
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,324 | $7,780 |
$3,062
50,193
kWh
|
$7,262
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs