ITAC Assessment: OK0795
ITAC logo
ITAC Assessment: OK0795
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Industrial Valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 235,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,919 7,261,742
kWh
Natural Gas $9,091 920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,324

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $41,350 $68,550 $41,350
677,864
kWh
-
02 2.2437: Recover waste heat from equipment $8,321 $4,015 - $8,321
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,567 $513 $2,567
42,087
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,677 $1,100 $1,677
27,484
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,244 $11,715 $2,244
36,793
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $24,260 $159,982 $24,260
397,704
kWh
-
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $896 $5,000 - $896
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $7,751 $1,680 $1,385
22,709
kWh
$6,366
-
MMBtu
09 2.7495: Install replacement doors $24,009 $51,300 $4,418
72,424
kWh
$19,591
-
MMBtu
TOTAL RECOMMENDED $113,075 $303,855 $77,901
1,277,065
kWh
$35,174
-
MMBtu
TOTAL IMPLEMENTED $10,324 $7,780 $3,062
50,193
kWh
$7,262
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs