ITAC Assessment: WM0186
ITAC logo
ITAC Assessment: WM0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Distribution Center for Water sports mainly
NAICS 493110: General Warehousing and Storage
SIC 4225: General Warehousing and Storage
Sales Range $1
M
to 5
M
# of Employees 410
Plant Area 1,088,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,500
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,721 8,043,341
kWh
Electricity Demand $196,147 14,839
kW-mo/yr
Electricity Fees $30,800 -
Natural Gas $98,252 16,562
MMBtu
Waste Disposal Costs
Water Usage $19,817 2,000
Tgal
TOTAL YEARLY COSTS $718,737
RECOMMENDED SAVINGS* $130,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $99,547 $82,860 $69,853
1,519,322
kWh
$29,694
-
kW-mo/yr
-
02 2.7444: Close holes and openings in building such as broken windows $25,831 $10,920 - - $25,831
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $2,140 $5,250 $1,559
33,904
kWh
$581
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,467 - $1,071
23,275
kWh
$396
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $786 $1,537 $514
11,183
kWh
$272
-
kW-mo/yr
-
06 2.4227: Use compressor air filters $643 $2,773 $469
10,183
kWh
$174
-
kW-mo/yr
-
07 2.7444: Close holes and openings in building such as broken windows $230 $326 - - $230
-
MMBtu
TOTAL RECOMMENDED $130,644 $103,666 $73,466
1,597,867
kWh
$31,117
-
kW-mo/yr
$26,061
-
MMBtu
TOTAL IMPLEMENTED $103,154 $88,110 $72,484
1,576,501
kWh
$30,671
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs