Assessment Year | 2022 |
---|---|
Principal Product | Plastic Injection Molded Products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
58,000
ft2
|
Annual Production | 41,551,762
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $118,076 | 2,186,250 |
kWh
|
$0.054 | |
Electricity Demand | $77,049 | 6,018 |
kW-mo/yr
|
$12.80 | |
Electricity Fees | $20,103 | - |
|
- | |
Natural Gas | $7,474 | 1,194 |
MMBtu
|
$6.26 | |
Waste Disposal Costs | |||||
Water Usage | $5,586 | 345 |
Tgal
|
$16.17 | |
TOTAL YEARLY COSTS | $228,288 | ||||
RECOMMENDED SAVINGS* | $8,352 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $2,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,587 | $6,099 |
$2,107
39,013
kWh
|
$480
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,550 | $2,213 |
$1,262
23,362
kWh
|
$288
-
kW-mo/yr
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $873 | - | - | - |
$873
-
MMBtu
|
|
04 | 2.7444: Close holes and openings in building such as broken windows | $863 | $603 | - | - |
$863
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $784 | - |
$638
11,822
kWh
|
$146
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $715 | - |
$715
13,235
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $495 | $933 |
$403
7,461
kWh
|
$92
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $485 | $705 |
$485
8,986
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,352 | $10,553 |
$5,609
103,879
kWh
|
$1,006
-
kW-mo/yr
|
$1,737
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,858 | $705 |
$1,838
34,043
kWh
|
$146
-
kW-mo/yr
|
$873
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs