ITAC Assessment: WM0181
ITAC logo
ITAC Assessment: WM0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic Injection Molded Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 58,000
ft2
Annual Production 41,551,762
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,076 2,186,250
kWh
Electricity Demand $77,049 6,018
kW-mo/yr
Electricity Fees $20,103 -
Natural Gas $7,474 1,194
MMBtu
Waste Disposal Costs
Water Usage $5,586 345
Tgal
TOTAL YEARLY COSTS $228,288
RECOMMENDED SAVINGS* $8,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,587 $6,099 $2,107
39,013
kWh
$480
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,550 $2,213 $1,262
23,362
kWh
$288
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $873 - - - $873
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $863 $603 - - $863
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $784 - $638
11,822
kWh
$146
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $715 - $715
13,235
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $495 $933 $403
7,461
kWh
$92
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $485 $705 $485
8,986
kWh
- -
TOTAL RECOMMENDED $8,352 $10,553 $5,609
103,879
kWh
$1,006
-
kW-mo/yr
$1,737
-
MMBtu
TOTAL IMPLEMENTED $2,858 $705 $1,838
34,043
kWh
$146
-
kW-mo/yr
$873
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs