ITAC Assessment: UF0004
ITAC logo
ITAC Assessment: UF0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PVC PIPE AND FITTINGS
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area
n/a
Annual Production 109,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $788,939 19,365,475
kWh
LPG $68,378 6,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,045 $4,157 $3,045
74,736
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $1,831 $550
13,482
kWh
03 2.7144: Install spectral reflectors / delamp $4,864 $1,500 $4,864
112,837
kWh
04 2.7111: Reduce illumination to minimum necessary levels $3,887 - $3,887
95,252
kWh
05 2.4133: Use most efficient type of electric motors $2,153 $11,146 $2,153
52,755
kWh
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,903 $1,450 $1,903
46,600
kWh
07 2.4322: Use or replace with energy efficient substitutes $19,532 $60,000 $19,532
478,605
kWh
08 2.7234: Use heat pump for space conditioning $230 - $230
5,569
kWh
TOTAL RECOMMENDED $36,164 $80,084 $36,164
879,836
kWh
TOTAL IMPLEMENTED $36,164 $80,084 $36,164
879,836
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs