Assessment Year | 2021 |
---|---|
Principal Product | Metal Stampings |
NAICS | 332111: Iron and Steel Forging |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 373 |
Plant Area |
106,553
ft2
|
Annual Production | 25,800,000
lb
|
Production Hrs. Annual | 7,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $109,899 | 1,778,700 |
kWh
|
$0.062 | |
Electricity Demand | $88,005 | 5,829 |
kW-mo/yr
|
$15.10 | |
Electricity Fees | $17,196 | - |
|
- | |
Natural Gas | $14,431 | 2,478 |
MMBtu
|
$5.82 | |
Waste Disposal Costs | |||||
Water Usage | $5,836 | 252 |
Tgal
|
$23.16 | |
TOTAL YEARLY COSTS | $235,367 | ||||
RECOMMENDED SAVINGS* | $25,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $6,320 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $6,165 | $21,350 | - | - |
$6,165
-
MMBtu
|
|
02 | 2.4314: Use synthetic lubricant | $4,530 | $3,000 |
$4,530
73,317
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,251 | - |
$3,214
52,011
kWh
|
$1,037
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,969 | $4,800 |
$3,001
48,563
kWh
|
$968
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,662 | $8,830 |
$2,831
45,823
kWh
|
$830
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,352 | $2,425 |
$1,021
16,526
kWh
|
$1,331
-
kW-mo/yr
|
- | |
07 | 2.7444: Close holes and openings in building such as broken windows | $920 | $2,140 | - | - |
$920
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,848 | $42,545 |
$14,597
236,240
kWh
|
$4,166
-
kW-mo/yr
|
$7,085
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,320 | $7,225 |
$4,022
65,089
kWh
|
$2,299
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs