| Assessment Year | 1996 |
|---|---|
| Principal Product | Escalators, autowalks |
| NAICS |
n/a
|
| SIC | 3534: Elevators and Moving Stairways |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
68,000
ft2
|
| Annual Production | 250
pieces
|
| Production Hrs. Annual | 2,996
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $47,199 | 926,436 |
kWh
|
$0.051 |
| Electricity Demand | $17,125 | 3,040 |
kW-mo/yr
|
$5.63 |
| Electricity Fees | $1,487 | - |
|
- |
| Natural Gas | $11,312 | 2,213 |
MMBtu
|
$5.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,988 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $4,344 | $701 | n/a | - | - |
$4,344
-
MMBtu
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $154 | $1,365 | n/a |
$101
2,052
kWh
|
$53
-
kW-mo/yr
|
- | - |
| 03 | 2.4133: Use most efficient type of electric motors | $269 | $520 | n/a |
$233
4,689
kWh
|
$36
-
kW-mo/yr
|
- | - |
| 04 | 2.7261: Install timers and/or thermostats | $1,815 | $1,365 | n/a |
$1,815
35,463
kWh
|
- | - | - |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $320 | n/a |
$580
11,430
kWh
|
- | - | - |
| 06 | 3.6192: Use a less expensive method of waste removal | $7,826 | $8,120 | n/a | - | - | - |
$7,826
-
lb
|
| TOTAL RECOMMENDED | $14,988 | $12,391 |
$2,729
53,634
kWh
|
$89
-
kW-mo/yr
|
$4,344
-
MMBtu
|
$7,826
-
lb
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs