ITAC Assessment: WM0148
ITAC logo
ITAC Assessment: WM0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Flexible Packaging
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 77
Plant Area 86,000
ft2
Annual Production 100
ton
Production Hrs. Annual 6,264
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,151 2,777,205
kWh
Electricity Demand $36,470 4,291
kW-mo/yr
Natural Gas $47,169 9,627
MMBtu
Waste Disposal Costs
Water Usage $1,965 319
Tgal
TOTAL YEARLY COSTS $294,755
RECOMMENDED SAVINGS* $76,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,477

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2442: Preheat combustion air with waste heat $23,863 $21,000 - - - $23,863
-
MMBtu
02 2.9114: Use solar heat to make electricty $21,662 $106,000 $21,662
276,867
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,757 - $5,035
66,847
kWh
$723
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,118 $5,000 $4,545
60,362
kWh
$573
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,478 $8,880 $3,046
40,569
kWh
$432
-
kW-mo/yr
- -
06 2.7444: Close holes and openings in building such as broken windows $3,158 $1,365 - - - $3,158
-
MMBtu
07 2.7231: Use radiant heater for spot heating $3,041 $2,800 - - - $3,041
-
MMBtu
08 2.7135: Install occupancy sensors $1,718 $2,325 $1,718
22,812
kWh
- - -
09 2.4221: Install compressor air intakes in coolest locations $1,616 $3,900 $1,414
18,768
kWh
$202
-
kW-mo/yr
- -
10 2.7444: Close holes and openings in building such as broken windows $1,409 $1,750 - - - $1,409
-
MMBtu
11 2.3132: Recharge batteries on during off-peak demand periods $1,396 - - - $1,396 -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,320 $2,340 $1,118
14,838
kWh
$202
-
kW-mo/yr
- -
13 2.7221: Lower temperature during the winter season and vice-versa $1,087 - $484
6,402
kWh
$604
-
kW-mo/yr
- -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $805 $1,664 $697
9,250
kWh
$108
-
kW-mo/yr
- -
15 2.4231: Reduce the pressure of compressed air to the minimum required $741 $970 $741
9,884
kWh
- - -
16 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $617 $1,175 $617
8,193
kWh
- - -
TOTAL RECOMMENDED $76,786 $159,169 $41,076
534,792
kWh
$2,843
-
kW-mo/yr
$1,396 $31,471
-
MMBtu
TOTAL IMPLEMENTED $10,477 $8,029 $5,242
69,612
kWh
$681
-
kW-mo/yr
$1,396 $3,158
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs