ITAC Assessment: ME0268
ITAC logo
ITAC Assessment: ME0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Poker Chips
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area 83,000
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,220 204,279
kWh
Electricity Demand $6,518 750
kW-mo/yr
Electricity Fees $1,348 -
LPG $8,730 945
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,554 $4,763 $994
13,189
kWh
$560
-
kW-mo/yr
- -
02 4.811: Demolish old building to reduce tax and insurance bills $1,000 - - - - $1,000
03 4.211: Consider use / purchase of bulk materials where possible $860 - - - - $860
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $697 $300 $672
9,672
kWh
$435
-
kW-mo/yr
$(-410.0)
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $568 $250 $568
8,206
kWh
- - -
06 2.2511: Insulate bare equipment $567 $54 $567
4,982
kWh
- - -
07 4.652: Replace existing equipment with more suitable substitutes $355 $980 $355
4,689
kWh
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $338 $482 $338
4,103
kWh
- - -
09 4.821: Pay bills on time to avoid late fees $281 - - - - $281
10 2.8121: Apply for tax-free status for energy purchases $186 - - - - $186
11 2.4221: Install compressor air intakes in coolest locations $82 $100 $82
1,172
kWh
- - -
12 4.821: Pay bills on time to avoid late fees $49 - - - - $49
TOTAL RECOMMENDED $6,537 $6,929 $3,576
46,013
kWh
$995
-
kW-mo/yr
$(-410.0)
-
MMBtu
$2,376
TOTAL IMPLEMENTED $5,533 $5,795 $2,572
35,170
kWh
$995
-
kW-mo/yr
$(-410.0)
-
MMBtu
$2,376
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs