ITAC Assessment: WM0102
ITAC logo
ITAC Assessment: WM0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Italian Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 90,000
ft2
Annual Production 87,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,321,021 21,871,229
kWh
Electricity Demand $491,531 36,359
kW-mo/yr
Electricity Fees $89,764 -
Natural Gas $762,074 271,600
MMBtu
TOTAL YEARLY COSTS $2,664,390
RECOMMENDED SAVINGS* $194,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $149,714 $205,925 - $106,746
-
kW-mo/yr
$42,968 -
02 2.3137: Use power during off-peak periods $23,950 $64,500 - $18,170
-
kW-mo/yr
$5,780 -
03 2.2135: Repair and eliminate steam leaks $9,764 $1,490 $7,521
118,483
kWh
$2,243
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $4,200 $1,100 $3,240
51,035
kWh
$960
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,059 $5,282 $3,126
49,249
kWh
$933
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $2,034 $4,700 - - - $2,034
-
MMBtu
07 2.2511: Insulate bare equipment $1,239 $863 - - - $1,239
-
MMBtu
TOTAL RECOMMENDED $194,960 $283,860 $13,887
218,767
kWh
$129,052
-
kW-mo/yr
$48,748 $3,273
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs