Assessment Year | 2017 |
---|---|
Principal Product | Italian Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
90,000
ft2
|
Annual Production | 87,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,321,021 | 21,871,229 |
kWh
|
$0.060 |
Electricity Demand | $491,531 | 36,359 |
kW-mo/yr
|
$13.52 |
Electricity Fees | $89,764 | - |
|
- |
Natural Gas | $762,074 | 271,600 |
MMBtu
|
$2.81 |
TOTAL YEARLY COSTS | $2,664,390 | |||
RECOMMENDED SAVINGS* | $194,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3112: Store heated/ cooled water for use during peak demand periods | $149,714 | $205,925 | - |
$106,746
-
kW-mo/yr
|
$42,968 | - | |
02 | 2.3137: Use power during off-peak periods | $23,950 | $64,500 | - |
$18,170
-
kW-mo/yr
|
$5,780 | - | |
03 | 2.2135: Repair and eliminate steam leaks | $9,764 | $1,490 |
$7,521
118,483
kWh
|
$2,243
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $4,200 | $1,100 |
$3,240
51,035
kWh
|
$960
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,059 | $5,282 |
$3,126
49,249
kWh
|
$933
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $2,034 | $4,700 | - | - | - |
$2,034
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $1,239 | $863 | - | - | - |
$1,239
-
MMBtu
|
|
TOTAL RECOMMENDED | $194,960 | $283,860 |
$13,887
218,767
kWh
|
$129,052
-
kW-mo/yr
|
$48,748 |
$3,273
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs