ITAC Assessment: WM0055
ITAC logo
ITAC Assessment: WM0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Custom Gearing
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 138
Plant Area 265,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,950 9,453,834
kWh
Electricity Demand $264,762 20,586
kW-mo/yr
Electricity Fees $13,492 -
Natural Gas $729,664 117,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.2437: Recover waste heat from equipment $4,250 $7,500 - - - $4,250
-
MMBtu
-
02 2.3132: Recharge batteries on during off-peak demand periods $2,514 - - - $2,514 - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,316 $600 $1,591
25,286
kWh
$725
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $4,969 $715 $3,547
56,372
kWh
$1,422
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $610 $630 $610
9,694
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,131 $7,030 $1,439
22,868
kWh
$692
-
kW-mo/yr
- - -
07 2.7221: Lower temperature during the winter season and vice-versa $1,975 - $1,860
29,563
kWh
$115
-
kW-mo/yr
- - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $955 $3,000 - - - $955
-
MMBtu
-
09 3.4151: Minimize water usage $24,836 $160 - - - - $24,836
-
Tgal
TOTAL RECOMMENDED $44,556 $19,635 $9,047
143,783
kWh
$2,954
-
kW-mo/yr
$2,514 $5,205
-
MMBtu
$24,836
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs