Assessment Year | 2001 |
---|---|
Principal Product | valves |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 28 |
Plant Area |
18,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $16,803 | 219,186 |
kWh
|
$0.077 |
Electricity Demand | $11,449 | 1,464 |
kW-mo/yr
|
$7.82 |
Electricity Fees | $4,768 | - |
|
- |
Natural Gas | $2,172 | 219 |
MMBtu
|
$9.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7145: Install skylights | $1,651 | $4,100 |
$788
9,698
kWh
|
$863
-
kW-mo/yr
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,862 | - |
$1,176
14,464
kWh
|
$686
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,731 | $460 |
$2,356
28,999
kWh
|
$1,375
-
kW-mo/yr
|
- | - | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $2,824 | - |
$1,898
23,340
kWh
|
$926
-
kW-mo/yr
|
- | - | |
05 | 3.7311: Maintain machines to reduce leaks | $750 | $350 | - | - |
$750
-
gal
|
- | |
06 | 4.114: Add/modify equipment to improve drying process | $7,268 | $1,500 | - | - | - | $7,268 | |
TOTAL RECOMMENDED | $18,086 | $6,410 |
$6,218
76,501
kWh
|
$3,850
-
kW-mo/yr
|
$750
-
gal
|
$7,268 | ||
TOTAL IMPLEMENTED | $9,167 | $810 |
$5,430
66,803
kWh
|
$2,987
-
kW-mo/yr
|
$750
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs