ITAC Assessment: WM0047
ITAC logo
ITAC Assessment: WM0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Steel Fabrications
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 210
Plant Area 212,000
ft2
Annual Production 23,000,000
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,549 8,768,400
kWh
Electricity Demand $230,382 22,765
kW-mo/yr
Electricity Fees $41,321 -
Natural Gas $117,099 18,015
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $19,205 $13,000 - - - $19,205
-
MMBtu
02 2.4314: Use synthetic lubricant $16,363 $3,379 $12,912
265,444
kWh
$3,451
-
kW-mo/yr
- -
03 2.1224: Replace boiler $18,181 $49,000 - - - $18,181
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $4,970 - $4,792
98,602
kWh
$178
-
kW-mo/yr
- -
05 2.5123: Reduce fluid flow rates $11,396 $1,567 $11,396
234,484
kWh
- - -
06 2.3132: Recharge batteries on during off-peak demand periods $1,884 - - - $1,884 -
07 2.4224: Upgrade controls on compressors $2,925 $5,500 $2,925
60,188
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $2,510 $3,628 $2,510
51,647
kWh
- - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,932 $2,100 - - - $1,932
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,430 $1,180 $1,745
35,898
kWh
$685
-
kW-mo/yr
- -
TOTAL RECOMMENDED $81,796 $79,354 $36,280
746,263
kWh
$4,314
-
kW-mo/yr
$1,884 $39,318
-
MMBtu
TOTAL IMPLEMENTED $28,537 $16,280 $6,537
134,500
kWh
$863
-
kW-mo/yr
- $21,137
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs