| Assessment Year | 2014 |
|---|---|
| Principal Product | Fiber Drums |
| NAICS | 322219: Other Paperboard Container Manufacturing |
| SIC | 2655: Fiber Cans, Tubes, Drums, and Similar Products |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1,300,000
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $88,955 | 1,673,842 |
kWh
|
$0.053 |
| Electricity Demand | $27,328 | 5,281 |
kW-mo/yr
|
$5.17 |
| Electricity Fees | $23,273 | - |
|
- |
| Natural Gas | $21,019 | 2,822 |
MMBtu
|
$7.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,609 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,715 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,231 | $300 |
$981
18,456
kWh
|
$250
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $734 | $288 |
$585
11,013
kWh
|
$149
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $501 | - |
$399
7,509
kWh
|
$102
-
kW-mo/yr
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,034 | $2,340 | - | - |
$1,034
-
MMBtu
|
|
| 05 | 2.4314: Use synthetic lubricant | $3,625 | $2,066 |
$2,740
51,558
kWh
|
$885
-
kW-mo/yr
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,162 | $9,680 |
$7,478
140,730
kWh
|
$1,904
-
kW-mo/yr
|
$(-1,220.0)
-
MMBtu
|
|
| 07 | 2.7135: Install occupancy sensors | $322 | $340 |
$322
6,059
kWh
|
- | - | |
| TOTAL RECOMMENDED | $15,609 | $15,014 |
$12,505
235,325
kWh
|
$3,290
-
kW-mo/yr
|
$(-186.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,715 | $10,320 |
$8,781
165,245
kWh
|
$2,154
-
kW-mo/yr
|
$(-1,220.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs