| Assessment Year | 1994 |
|---|---|
| Principal Product | navaids |
| NAICS |
n/a
|
| SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
| Sales Range | $50 M to 100M |
| # of Employees | 600 |
| Plant Area |
500,000
ft2
|
| Annual Production | 150
pieces
|
| Production Hrs. Annual | 2,500
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $658,911 | 10,662,368 |
kWh
|
$0.062 |
| Natural Gas | $62,220 | 12,232 |
MMBtu
|
$5.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $99,101 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $88,674 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,997 | $73,718 |
$58,997
694,607
kWh
|
- | |
| 02 | 2.7124: Make a practice of turning off lights when not needed | $21,533 | - |
$21,533
348,476
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $7,081 | $2,950 |
$7,081
114,596
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,871 | $2,862 |
$4,871
34,291
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,140 | $1,369 |
$2,140
14,361
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $290 | $300 |
$290
4,689
kWh
|
- | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,698 | $700 |
$2,698
43,669
kWh
|
- | |
| 08 | 2.2514: Cover open tanks | $916 | $2,056 | - |
$916
-
MMBtu
|
|
| 09 | 2.4314: Use synthetic lubricant | $303 | $510 |
$303
3,224
kWh
|
- | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $272 | $150 |
$272
4,396
kWh
|
- | |
| TOTAL RECOMMENDED | $99,101 | $84,615 |
$98,185
1,262,309
kWh
|
$916
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $88,674 | $77,940 |
$88,674
1,128,663
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs