ITAC Assessment: KU0441
ITAC logo
ITAC Assessment: KU0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product navaids
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 500,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,911 10,662,368
kWh
Natural Gas $62,220 12,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $58,997 $73,718 $58,997
694,607
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $21,533 - $21,533
348,476
kWh
-
03 2.7135: Install occupancy sensors $7,081 $2,950 $7,081
114,596
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,871 $2,862 $4,871
34,291
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,140 $1,369 $2,140
14,361
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $290 $300 $290
4,689
kWh
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,698 $700 $2,698
43,669
kWh
-
08 2.2514: Cover open tanks $916 $2,056 - $916
-
MMBtu
09 2.4314: Use synthetic lubricant $303 $510 $303
3,224
kWh
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $272 $150 $272
4,396
kWh
-
TOTAL RECOMMENDED $99,101 $84,615 $98,185
1,262,309
kWh
$916
-
MMBtu
TOTAL IMPLEMENTED $88,674 $77,940 $88,674
1,128,663
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs