Assessment Year 2013
Principal Product Concrete
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 36,674
ft2
Annual Production 21,405
ton
Production Hrs. Annual 4,342
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,522 496,400
kWh
Electricity Demand $29,055 2,559
kW-mo/yr
Natural Gas $39,806 5,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,786

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 3.3122: Use filtration, centrifuging to remove contaminants $15,394 $14,000 - - - - - - $15,394
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,832 $4,600 $2,832
41,045
kWh
- - - - - -
03 2.8114: Change rate schedules or other changes in utility service $3,254 - - - - - - $3,254 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,201 $6,488 $1,201
21,450
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,390 $3,840 $937
13,579
kWh
$453
-
kW-mo/yr
- - - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $2,894 $5,000 - - - $2,894
-
lb
- - -
07 4.821: Pay bills on time to avoid late fees $593 - - - - - $593 - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $276 $705 - - $276
-
MMBtu
- - - -
09 4.424: Improve space comfort conditioning $3,840 $1,500 - - - - $3,840 - -
10 2.2136: Install / repair insulation on steam lines $122 $39 - - $122
-
MMBtu
- - - -
TOTAL RECOMMENDED $31,796 $36,172 $4,970
76,074
kWh
$453
-
kW-mo/yr
$398
-
MMBtu
$2,894
-
lb
$4,433 $3,254 $15,394
TOTAL IMPLEMENTED $24,786 $28,967 $4,970
76,074
kWh
$453
-
kW-mo/yr
$122
-
MMBtu
- $593 $3,254 $15,394
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs