ITAC Assessment: RU0034
ITAC logo
ITAC Assessment: RU0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AIRCRAFT AND PARTS
NAICS
n/a
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 406
Plant Area
n/a
Annual Production 100
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,387 1,866,940
kWh
Natural Gas $58,622 12,009
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,373 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,904 - $1,904
23,154
kWh
-
02 2.2514: Cover open tanks $1,151 $300 - $1,151
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,442 $2,000 $1,442
17,585
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,323 $500 - $1,323
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $1,647 $1,260 $(-159.0)
(-2,052)
kWh
$1,806
-
MMBtu
06 2.2532: Use only amount of air necessary to prevent explosion hazard $5,906 $11,900 $614
7,913
kWh
$5,292
-
MMBtu
TOTAL RECOMMENDED $13,373 $15,960 $3,801
46,600
kWh
$9,572
-
MMBtu
TOTAL IMPLEMENTED $4,669 $2,500 $3,346
40,739
kWh
$1,323
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs