ITAC Assessment: ME0200
ITAC logo
ITAC Assessment: ME0200
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Woven Industrial Fabric
NAICS
n/a
SIC 2291:
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 125,000
ft2
Annual Production 900,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,819 719,519
kWh
Electricity Demand $16,126 1,908
kW-mo/yr
Electricity Fees $895 -
Natural Gas $27,040 4,357
MMBtu
LPG $1,546 590
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,633

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,195 $19,432 $6,085
87,046
kWh
$110
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $1,060 $2,200 $1,060
14,947
kWh
- - - - -
03 2.8121: Apply for tax-free status for energy purchases $249 - - - - - $249 -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,080 $10,200 - - - $2,080
-
lb
- -
05 3.4151: Minimize water usage $553 $85 $525
7,327
kWh
- $3
-
Tgal
- - $25
-
Tgal
TOTAL RECOMMENDED $10,137 $31,917 $7,670
109,320
kWh
$110
-
kW-mo/yr
$3
-
Tgal
$2,080
-
lb
$249 $25
-
Tgal
TOTAL IMPLEMENTED $2,633 $10,285 $525
7,327
kWh
- $3
-
Tgal
$2,080
-
lb
- $25
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs