ITAC Assessment: MO0148
ITAC logo
ITAC Assessment: MO0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Foam Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $50
M
to 100
M
# of Employees 206
Plant Area 130,000
ft2
Annual Production 4,500,000
units
Production Hrs. Annual 5,880
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,466 7,537,808
kWh
Natural Gas $194,655 36,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $5,280 $13,770 - $5,280
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $2,641 $4,511 - $2,641
-
MMBtu
03 2.4133: Use most efficient type of electric motors $3,608 $7,503 $3,608
62,720
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $245 $55 $245
4,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,338 $9,124 $2,338
39,273
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,467 $441 $1,467
24,912
kWh
-
TOTAL RECOMMENDED $15,579 $35,404 $7,658
131,301
kWh
$7,921
-
MMBtu
TOTAL IMPLEMENTED $7,716 $12,455 $5,075
87,632
kWh
$2,641
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs