ITAC Assessment: WM0021
ITAC logo
ITAC Assessment: WM0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product PVD Coating
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 33
Plant Area 13,600
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,949 492,000
kWh
Electricity Demand $17,671 1,556
kW-mo/yr
Electricity Fees $5,425 -
Natural Gas $3,278 333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $483 $184 $370
5,703
kWh
$113
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $456 - $347
5,491
kWh
$109
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $263 $225 $263
4,063
kWh
- - -
04 2.8212: Reduce delivery schedules $732 - - - - $732
05 2.2511: Insulate bare equipment $234 $47 $234
3,839
kWh
- - -
06 2.1221: Replace obsolete burners with more efficient ones $992 $1,544 $992
15,280
kWh
- - -
07 2.2515: Use optimum thickness insulation $118 $325 $5
79
kWh
- $113
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $170 $32 - - $170
-
MMBtu
-
09 2.7494: Install storm windows and doors $57 $16 - - $57
-
MMBtu
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,982 $9,000 $3,982
61,357
kWh
- - -
TOTAL RECOMMENDED $7,487 $11,373 $6,193
95,812
kWh
$222
-
kW-mo/yr
$340
-
MMBtu
$732
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs