ITAC Assessment: HO0167
ITAC logo
ITAC Assessment: HO0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Waste reduction equipment
NAICS
n/a
SIC 3359:
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 65,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,960 536,342
kWh
Electricity Demand $23,695 2,048
kW-mo/yr
Electricity Fees $(-2,599.0) -
Natural Gas $17,646 2,884
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,801 $37,734 $6,803
79,426
kWh
$4,998
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,615 $6,215 $2,088
24,326
kWh
$1,527
-
kW-mo/yr
- -
03 2.7231: Use radiant heater for spot heating $3,129 $6,600 - - $3,129
-
MMBtu
-
04 2.7135: Install occupancy sensors $2,275 $1,400 $2,275
26,671
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $530 - $530
6,155
kWh
- - -
06 2.7111: Reduce illumination to minimum necessary levels $1,269 $30 $733
8,499
kWh
$536
-
kW-mo/yr
- -
07 2.7144: Install spectral reflectors / delamp $2,240 $9,000 $1,296
24,033
kWh
$944
-
kW-mo/yr
- -
08 4.211: Consider use / purchase of bulk materials where possible $1,765 $500 - - - $1,765
09 4.423: Move product using mechanical means $975 $100 - - - $975
TOTAL RECOMMENDED $27,599 $61,579 $13,725
169,110
kWh
$8,005
-
kW-mo/yr
$3,129
-
MMBtu
$2,740
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs