Assessment Year | 1985 |
---|---|
Principal Product | PROPANE CYLINDERS |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
n/a
|
Annual Production | 15,500,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $195,219 | 2,808,910 |
kWh
|
$0.069 |
Natural Gas | $328,333 | 55,244 |
MMBtu
|
$5.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $119,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $105,515 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $722 | $581 |
$722
10,551
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,090 | $222 |
$3,090
43,962
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $937 | $125 |
$937
13,482
kWh
|
- | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $7,830 | $7,000 | - |
$7,830
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,875 | $500 | - |
$2,875
-
MMBtu
|
|
06 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $97,891 | - | - |
$97,891
-
MMBtu
|
|
07 | 2.3191: Use demand controller or load shedder | $5,990 | $12,500 |
$5,990
-
kWh
|
- | |
TOTAL RECOMMENDED | $119,335 | $20,928 |
$10,739
67,995
kWh
|
$108,596
-
MMBtu
|
||
TOTAL IMPLEMENTED | $105,515 | $1,428 |
$4,749
67,995
kWh
|
$100,766
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs