ITAC Assessment: GT0248
ITAC logo
ITAC Assessment: GT0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PROPANE CYLINDERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 15,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $195,219 2,808,910
kWh
Natural Gas $328,333 55,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $105,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $722 $581 $722
10,551
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,090 $222 $3,090
43,962
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $937 $125 $937
13,482
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $7,830 $7,000 - $7,830
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,875 $500 - $2,875
-
MMBtu
06 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $97,891 - - $97,891
-
MMBtu
07 2.3191: Use demand controller or load shedder $5,990 $12,500 $5,990
-
kWh
-
TOTAL RECOMMENDED $119,335 $20,928 $10,739
67,995
kWh
$108,596
-
MMBtu
TOTAL IMPLEMENTED $105,515 $1,428 $4,749
67,995
kWh
$100,766
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs