Assessment Year | 2013 |
---|---|
Principal Product | Lithium Ion Cells, Modules, Packs, Systems and Battery |
NAICS | 335912: Primary Battery Manufacturing |
SIC | 3692: Primary Batteries, Dry and Wet |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
220,000
ft2
|
Annual Production | 615
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,566 | 3,033,820 |
kWh
|
$0.058 |
Electricity Demand | $76,839 | 7,889 |
kW-mo/yr
|
$9.74 |
Electricity Fees | $4,681 | - |
|
- |
Natural Gas | $87,202 | 11,553 |
MMBtu
|
$7.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,318 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $21,525 | - |
$1,984
34,095
kWh
|
- |
$19,541
-
MMBtu
|
|
02 | 2.6218: Turn off equipment when not in use | $5,948 | - |
$5,948
102,346
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,627 | - |
$1,325
22,776
kWh
|
$302
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,371 | - |
$1,371
23,568
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $1,316 | $1,171 | - | - |
$1,316
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $2,095 | $4,480 |
$1,043
17,920
kWh
|
$1,052
-
kW-mo/yr
|
- | |
07 | 2.7313: Recycle air for heating, ventilation and air conditioning | $33,436 | $104,600 |
$21,861
375,691
kWh
|
$3,959
-
kW-mo/yr
|
$7,616
-
MMBtu
|
|
TOTAL RECOMMENDED | $67,318 | $110,251 |
$33,532
576,396
kWh
|
$5,313
-
kW-mo/yr
|
$28,473
-
MMBtu
|
||
TOTAL IMPLEMENTED | $31,787 | $1,171 |
$10,628
182,785
kWh
|
$302
-
kW-mo/yr
|
$20,857
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |