| Assessment Year | 2006 |
|---|---|
| Principal Product | Precision machining |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 155 |
| Plant Area |
95,000
ft2
|
| Annual Production | 107,000,000
lb
|
| Production Hrs. Annual | 8,590
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $133,513 | 4,827,485 |
kWh
|
$0.028 |
| Electricity Demand | $102,654 | 10,719 |
kW-mo/yr
|
$9.58 |
| Natural Gas | $35,255 | 3,337 |
MMBtu
|
$10.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,022,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,928 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.132: Purchase new equipment to reduce material use / cost | $987,800 | - | - | - | - | $987,800 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,265 | $33,480 |
$11,631
401,067
kWh
|
$5,634
-
kW-mo/yr
|
- | - | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $7,330 | $1,600 | - | - |
$7,330
-
MMBtu
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $5,311 | $1,000 | - | - |
$5,311
-
MMBtu
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $2,187 | $325 |
$2,187
75,413
kWh
|
- | - | - | |
| 06 | 2.7261: Install timers and/or thermostats | $1,556 | $200 | - | - |
$1,556
-
MMBtu
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,352 | $2,560 |
$688
23,716
kWh
|
$664
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $1,022,801 | $39,165 |
$14,506
500,196
kWh
|
$6,298
-
kW-mo/yr
|
$14,197
-
MMBtu
|
$987,800 | ||
| TOTAL IMPLEMENTED | $23,928 | $37,040 |
$12,319
424,783
kWh
|
$6,298
-
kW-mo/yr
|
$5,311
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs