ITAC Assessment: IC0261
ITAC logo
ITAC Assessment: IC0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Livestock Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 31,250
ft2
Annual Production 18,000
ton
Production Hrs. Annual 2,860
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,201 460,200
kWh
Electricity Fees $1,867 -
Natural Gas $36,877 4,735
MMBtu
Waste Disposal Costs
Water Usage $8,713 814,000
Tgal
TOTAL YEARLY COSTS $127,658
RECOMMENDED SAVINGS* $21,462 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,462

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,140 $789 $1,140
6,402
kWh
- -
02 2.2135: Repair and eliminate steam leaks $4,207 $360 - $4,207
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $2,477 $1,392 - $2,477
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,943 $22,735 $12,943
74,387
kWh
- -
05 3.4155: Meter waste water $695 $600 - - $695
-
Tgal
TOTAL RECOMMENDED $21,462 $25,876 $14,083
80,789
kWh
$6,684
-
MMBtu
$695
-
Tgal
TOTAL IMPLEMENTED $21,462 $25,876 $14,083
80,789
kWh
$6,684
-
MMBtu
$695
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs