Assessment Year | 2022 |
---|---|
Principal Product | Livestock Feed |
NAICS | 311119: Other Animal Food Manufacturing |
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $10 M to 50M |
# of Employees | 15 |
Plant Area |
31,250
ft2
|
Annual Production | 18,000
ton
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,201 | 460,200 |
kWh
|
$0.17 | |
Electricity Fees | $1,867 | - |
|
- | |
Natural Gas | $36,877 | 4,735 |
MMBtu
|
$7.79 | |
Waste Disposal Costs | |||||
Water Usage | $8,713 | 814,000 |
Tgal
|
$0.011 | |
TOTAL YEARLY COSTS | $127,658 | ||||
RECOMMENDED SAVINGS* | $21,462 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $21,462 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,140 | $789 |
$1,140
6,402
kWh
|
- | - | |
02 | 2.2135: Repair and eliminate steam leaks | $4,207 | $360 | - |
$4,207
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $2,477 | $1,392 | - |
$2,477
-
MMBtu
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,943 | $22,735 |
$12,943
74,387
kWh
|
- | - | |
05 | 3.4155: Meter waste water | $695 | $600 | - | - |
$695
-
Tgal
|
|
TOTAL RECOMMENDED | $21,462 | $25,876 |
$14,083
80,789
kWh
|
$6,684
-
MMBtu
|
$695
-
Tgal
|
||
TOTAL IMPLEMENTED | $21,462 | $25,876 |
$14,083
80,789
kWh
|
$6,684
-
MMBtu
|
$695
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs