ITAC Assessment: GT0395
ITAC logo
ITAC Assessment: GT0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DYED CARPET
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area
n/a
Annual Production 60,000
thousand feet
Production Hrs. Annual 4,800
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,689 5,371,043
kWh
Natural Gas $381,390 130,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,064 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,194

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $12,473 $5,292 $12,473
203,693
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $877 $187 $877
14,361
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,749 $2,250 $2,749
44,842
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,422 - $7,422
121,336
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $13,220 $10,000 - $13,220
-
MMBtu
06 2.2511: Insulate bare equipment $650 $1,385 - $650
-
MMBtu
07 2.5123: Reduce fluid flow rates $26,673 $3,000 - $26,673
-
MMBtu
TOTAL RECOMMENDED $64,064 $22,114 $23,521
384,232
kWh
$40,543
-
MMBtu
TOTAL IMPLEMENTED $50,194 $10,729 $23,521
384,232
kWh
$26,673
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs