ITAC Assessment: CO0369
ITAC logo
ITAC Assessment: CO0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product sheet metal enclosures
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 81,000
ft2
Annual Production 22,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,460 2,535,463
kWh
Electricity Demand $23,117 3,340
kW-mo/yr
Electricity Fees $606 -
Natural Gas $52,388 13,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $16,300 $1,500 - - - - $16,300
02 2.8113: Purchase gas directly from a contract gas supplier $11,310 $500 - - - $11,310 -
03 2.2511: Insulate bare equipment $4,040 $8,200 - - $4,040
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $329 $1,013 $191
12,016
kWh
$138
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $58 $115 $58
1,172
kWh
- - - -
TOTAL RECOMMENDED $32,037 $11,328 $249
13,188
kWh
$138
-
kW-mo/yr
$4,040
-
MMBtu
$11,310 $16,300
TOTAL IMPLEMENTED $11,697 $1,628 $249
13,188
kWh
$138
-
kW-mo/yr
- $11,310 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs