ITAC Assessment: MA0642
ITAC logo
ITAC Assessment: MA0642
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Paper mill roll covers
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 50,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 4,160
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,318 1,263,600
kWh
Electricity Demand $40,090 5,053
kW-mo/yr
Electricity Fees $1,308 -
Natural Gas $108,397 9,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,279 $27,924 $10,996
99,770
kWh
$2,283
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $4,095 $4,354 - - $4,095
-
MMBtu
03 2.7314: Reduce ventilation air $3,315 $1,000 - - $3,315
-
MMBtu
04 2.3212: Optimize plant power factor $1,935 $6,500 - $1,935
-
kW-mo/yr
-
05 2.1213: Direct warmest air to combustion intake $1,273 $5,500 - - $1,273
-
MMBtu
06 2.3212: Optimize plant power factor $391 $900 $391
3,554
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $251 $120 $251
2,279
kWh
- -
TOTAL RECOMMENDED $24,539 $46,298 $11,638
105,603
kWh
$4,218
-
kW-mo/yr
$8,683
-
MMBtu
TOTAL IMPLEMENTED $13,530 $28,044 $11,247
102,049
kWh
$2,283
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs