Assessment Year | 2008 |
---|---|
Principal Product | Paper mill roll covers |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 25 |
Plant Area |
50,000
ft2
|
Annual Production | 500
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $140,318 | 1,263,600 |
kWh
|
$0.11 |
Electricity Demand | $40,090 | 5,053 |
kW-mo/yr
|
$7.93 |
Electricity Fees | $1,308 | - |
|
- |
Natural Gas | $108,397 | 9,026 |
MMBtu
|
$12.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,539 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,530 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,279 | $27,924 |
$10,996
99,770
kWh
|
$2,283
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $4,095 | $4,354 | - | - |
$4,095
-
MMBtu
|
|
03 | 2.7314: Reduce ventilation air | $3,315 | $1,000 | - | - |
$3,315
-
MMBtu
|
|
04 | 2.3212: Optimize plant power factor | $1,935 | $6,500 | - |
$1,935
-
kW-mo/yr
|
- | |
05 | 2.1213: Direct warmest air to combustion intake | $1,273 | $5,500 | - | - |
$1,273
-
MMBtu
|
|
06 | 2.3212: Optimize plant power factor | $391 | $900 |
$391
3,554
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $251 | $120 |
$251
2,279
kWh
|
- | - | |
TOTAL RECOMMENDED | $24,539 | $46,298 |
$11,638
105,603
kWh
|
$4,218
-
kW-mo/yr
|
$8,683
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,530 | $28,044 |
$11,247
102,049
kWh
|
$2,283
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs