| Assessment Year | 2006 |
|---|---|
| Principal Product | sensors |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 500 |
| Plant Area |
82,000
ft2
|
| Annual Production | 1,440,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $280,269 | 7,916,400 |
kWh
|
$0.035 |
| Electricity Demand | $163,217 | 14,898 |
kW-mo/yr
|
$10.96 |
| Natural Gas | $11,843 | 899 |
MMBtu
|
$13.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $81,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4114: Replace city water with recycled water via cooling tower | $34,120 | $25,000 |
$(-9,080.0)
(-161,136)
kWh
|
- | - |
$43,200
-
Tgal
|
|
| 02 | 3.7142: Use clean in place (cip) systems | $24,741 | $37,800 |
$16,260
441,472
kWh
|
$8,481
-
kW-mo/yr
|
- | - | |
| 03 | 2.7261: Install timers and/or thermostats | $6,741 | - |
$2,299
61,826
kWh
|
- |
$4,442
-
MMBtu
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $6,107 | $1,000 | - | - |
$6,107
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,764 | $640 |
$1,752
47,251
kWh
|
$1,012
-
kW-mo/yr
|
- | - | |
| 06 | 2.4234: Cool compressor air intake with heat exchanger | $1,330 | - |
$755
26,856
kWh
|
$575
-
kW-mo/yr
|
- | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $1,189 | - |
$787
20,798
kWh
|
$402
-
kW-mo/yr
|
- | - | |
| 08 | 2.7241: Install outside air damper / economizer on hvac unit | $3,886 | $3,886 |
$3,886
104,455
kWh
|
- | - | - | |
| 09 | 2.2437: Recover waste heat from equipment | $769 | $400 | - | - |
$769
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $81,647 | $68,726 |
$16,659
541,522
kWh
|
$10,470
-
kW-mo/yr
|
$11,318
-
MMBtu
|
$43,200
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs