ITAC Assessment: LL0115
ITAC logo
ITAC Assessment: LL0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Fabricated Pipe
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 54,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,928 1,389,600
kWh
Electricity Demand $55,964 9,958
kW-mo/yr
Electricity Fees $(-21,367.0) -
Natural Gas $96,192 17,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,842 - $1,175
22,764
kWh
$596
-
kW-mo/yr
$71 -
02 2.7134: Use photocell controls $2,864 $282 $2,017
28,454
kWh
$736
-
kW-mo/yr
$111 -
03 2.3212: Optimize plant power factor $16,646 $15,900 - $16,006
-
kW-mo/yr
$640 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,683 $2,700 $13,136
185,569
kWh
- $547 -
05 3.5313: Increase amount of waste recovered for resale $5,625 - - - - $5,625
-
lb
TOTAL RECOMMENDED $40,660 $18,882 $16,328
236,787
kWh
$17,338
-
kW-mo/yr
$1,369 $5,625
-
lb
TOTAL IMPLEMENTED $21,150 $2,700 $14,311
208,333
kWh
$596
-
kW-mo/yr
$618 $5,625
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs