Assessment Year | 2001 |
---|---|
Principal Product | Fabricated Pipe |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
54,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $132,928 | 1,389,600 |
kWh
|
$0.096 |
Electricity Demand | $55,964 | 9,958 |
kW-mo/yr
|
$5.62 |
Electricity Fees | $(-21,367.0) | - |
|
- |
Natural Gas | $96,192 | 17,271 |
MMBtu
|
$5.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,150 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,842 | - |
$1,175
22,764
kWh
|
$596
-
kW-mo/yr
|
$71 | - | |
02 | 2.7134: Use photocell controls | $2,864 | $282 |
$2,017
28,454
kWh
|
$736
-
kW-mo/yr
|
$111 | - | |
03 | 2.3212: Optimize plant power factor | $16,646 | $15,900 | - |
$16,006
-
kW-mo/yr
|
$640 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,683 | $2,700 |
$13,136
185,569
kWh
|
- | $547 | - | |
05 | 3.5313: Increase amount of waste recovered for resale | $5,625 | - | - | - | - |
$5,625
-
lb
|
|
TOTAL RECOMMENDED | $40,660 | $18,882 |
$16,328
236,787
kWh
|
$17,338
-
kW-mo/yr
|
$1,369 |
$5,625
-
lb
|
||
TOTAL IMPLEMENTED | $21,150 | $2,700 |
$14,311
208,333
kWh
|
$596
-
kW-mo/yr
|
$618 |
$5,625
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs