ITAC Assessment: OK0454
ITAC logo
ITAC Assessment: OK0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 391
Plant Area 472,000
ft2
Annual Production 972
thousand feet
Production Hrs. Annual 3,744
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,108 3,427,315
kWh
Natural Gas $311,263 142,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $2,534 $180 $2,534
48,066
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $23,979 - $23,979
489,449
kWh
-
03 2.6232: Install set-back timers $767 $1,663 - $767
-
MMBtu
04 2.7132: Install timers on light switches in little used areas $2,628 $351 $2,628
53,634
kWh
-
05 2.7135: Install occupancy sensors $3,811 $1,996 $3,811
77,667
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,468 $16,443 $11,468
200,762
kWh
-
07 2.4133: Use most efficient type of electric motors $8,701 $14,986 $8,701
163,247
kWh
-
TOTAL RECOMMENDED $53,888 $35,619 $53,121
1,032,825
kWh
$767
-
MMBtu
TOTAL IMPLEMENTED $50,493 $33,605 $50,493
979,191
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs