ITAC Assessment: WI0507
ITAC logo
ITAC Assessment: WI0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Injection Molded Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 60,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,212 2,450,000
kWh
Electricity Demand $81,044 7,908
kW-mo/yr
Natural Gas $12,776 1,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,310 $23,700 $10,310
277,897
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $10,309 $13,000 $10,309
277,875
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $10,121 $2,000 $4,474
120,583
kWh
$5,647
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,441 $11,565 $2,766
74,550
kWh
$1,675
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $1,601 $338 $1,601
41,315
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,034 $30 $985
26,540
kWh
$49
-
kW-mo/yr
-
07 2.7261: Install timers and/or thermostats $856 $400 - - $856
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $688 $1,280 $374
10,077
kWh
$314
-
kW-mo/yr
-
09 2.3132: Recharge batteries on during off-peak demand periods $444 $200 - $444
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,804 $52,513 $30,819
828,837
kWh
$8,129
-
kW-mo/yr
$856
-
MMBtu
TOTAL IMPLEMENTED $28,638 $28,413 $20,509
550,940
kWh
$8,129
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs