Assessment Year | 2004 |
---|---|
Principal Product | Heat Exchanger Components |
NAICS | 332410: Power Boiler and Heat Exchanger Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 114 |
Plant Area |
160,000
ft2
|
Annual Production | 780,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,943 | 1,934,400 |
kWh
|
$0.034 |
Electricity Demand | $75,841 | 7,302 |
kW-mo/yr
|
$10.39 |
Natural Gas | $75,655 | 10,209 |
MMBtu
|
$7.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,621 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,842 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,842 | $30,850 |
$3,583
101,500
kWh
|
$6,259
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7261: Install timers and/or thermostats | $7,059 | $1,200 | - | - |
$7,059
-
MMBtu
|
- | - | - | |
03 | 3.4114: Replace city water with recycled water via cooling tower | $4,749 | $9,500 |
$(-769.0)
7,926
kWh
|
- | - |
$5,518
-
Tgal
|
- | - | |
04 | 3.3131: Use evaporation to concentrate material | $4,435 | $10,000 | - | - |
$(-855.0)
-
MMBtu
|
- |
$5,290
-
gal
|
- | |
05 | 3.7198: Reduce / eliminate use of disposable product | $3,550 | - | - | - | - | - | - | $3,550 | |
06 | 2.2437: Recover waste heat from equipment | $1,755 | $1,000 | - | - |
$1,755
-
MMBtu
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,231 | $740 |
$501
14,205
kWh
|
$730
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $32,621 | $53,290 |
$3,315
123,631
kWh
|
$6,989
-
kW-mo/yr
|
$7,959
-
MMBtu
|
$5,518
-
Tgal
|
$5,290
-
gal
|
$3,550 | ||
TOTAL IMPLEMENTED | $9,842 | $30,850 |
$3,583
101,500
kWh
|
$6,259
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs